| Name | Building A | Building B |
| Present Electric Load | Required 9.65 Kw Available 16.60 Kw |
Required 8.71Kw Available 19.33Kw |
| Date of Connection | 06/06/07 | 06/05/09 |
| Connection in the name of | ||
| Meter No. | ||
| Seal No. | ||
| Remarks |
| Building A | ||||
| S. No. | Name of Trade | Maximum Number of Unit in one Shift | Power Supply required as per norms | Power Supply available in the Institute |
| 1. | Dress Making | One | 1.0 K.w |
BUILDING-A 16.6 K.w |
| 2. | Electrician | One | 5.2 K.w | |
| 3. | COPA | One | 3.45 K.w | |
| Total | 9.65 Kw. | |||
| Building A | ||||
| S. No. | Name of Trade | Maximum Number of Unit in one Shift | Power Supply required as per norms | Power Supply available in the Institute |
| 1. | Electrician | One | 5.2 Kw |
BUILDING-B 19.33 Kw. |
| 2. | Fitter | One | 3.51 Kw. | |
| Total | 8.71 Kw. | |||