S. No. | Ownership Document/Lease Agreement for rented building | In Square Meters | Link to Scanned Document/Image |
a. | Total Area | 498.2 Sqmt | |
b. | Covered Area | BUILDING A – 417.355Sqmt BUILDING B – 269.54 Sqmt Total – 686.895 Sqmt |
|
c. | Total Class Rooms Area | ||
d. | Total Workshops Area | ||
e. | Drawing Hall | ||
f. | Audio Visual Hall | ||
g. | Computer Lab | ||
h. | Play Area | ||
i. | Library | ||
j. | Remarks |
Building A | ||||||
S. No | Name of Trade | Maximum Number of units in one Shift only | WORKSHOP | CLASS ROOM Actually Available | ||
Required Per DGE&T (Sq. M.) | Actually Available (Sq.M.) | Shortage (If Any) | ||||
1 | Principal Room | 12-15 Sqmt. | 3.90 × 5.25= 20.475 Sqmt. | Nil | ||
2 | Staff Room | 10-15 Sqmt. | 3.50 ×5.25=18.375 Sqmt. | Nil | ||
3. | Library – cum – record room | 15-20 Sqmt. | 3.30×4.70=15.51 Sqmt. | Nil | ||
4. | Store | 10-15 Sqmt. | 3.60×5.20=18.72 Sqmt. | Nil | ||
6. | Electrician | One | 97.6 Sq.mt. | 14.50 ×7=101.5 Sqmt. | No | 1 (3.70 × 9.50= 35.15 Sqmt.) |
8. | Fitter | One | 88 Sq.mt. | 91.8 Sq.mt. | — | 1 (23.1 sq.mt.) |
Total | 291.6 Sqmt. | 341.955 Sqmt. | 75.4 Sqmt. Total 341.955 +75.4 = 417.355 Sqmt. |
Building B | ||||||
S. No | Name of Trade | Maximum Number of units in one Shift only | WORKSHOP | CLASS ROOM Actually Available | ||
Required Per DGE&T (Sq. M.) | Actually Available (Sq.M.) | Shortage (If Any) | ||||
1 | Electrician Workshop | One | 97.6 Sqmt | 12 × 9 = 108 Sqmt. | No | 1(5.30 × 4.30=22.79 Sqmt.) |
2 | Fitter | One | 88 Sqmt | 10.20 × 9= 91.8 Sqmt. | No | 1 ( 3×7.70=23.1 Sqmt.) |
3. | Class room | One | 21 Sqmt | 5.30×4.50=23.85 Sqmt | No | |
Total | 206.6 Sqmt. | 223.65 Sqmt. | Nil | 45.89 Sqmt. Total 223.65 + 45.89= 269.54 Sqmt. |
Are there separate workshops and theory Lecture rooms for Each Trade | Yes |
Total Land area provided for the Institute | 02-00-00 Bigha Rent deed enclosed |
Date of Occupation | BUILDING A – 3/04/2007 BUILDING B – 23/03/09 |
Duration of lease and date of expiry of lease | 5 Years BUILDING A – 13/04/2012 BUILDING B – 23/03/14 |